Freelance Quantity Surveyor Service Provider
Independent estimating and takeoff work, done by one engineer
I offer remote quantity surveying services. You provide me with architectural and structural information and I will return with takeoffs, estimated materials required and a BOQ. I can also prepare tender documentation. If you have a good BIM model, I will extract 5D quantities from that also. All quantities given should be easily verifiable from the drawings, on a line by line basis.
I can take quantities from your architectural and structural drawings. I will provide you with quantity surveying reports and a BOQ. These can be used to price up and plan.
I've spent time on site and I've spent time in the estimating office, and I use both when I measure. Look through my background, my services, the sample BOQ formats and some takeoff and BIM outputs to see how I work.
I worked as both a quantity surveyor and a site engineer on G+4 to G+6 residential and commercial buildings. Part of my time went to estimating and the rest to running things on site.
Having worked in both quantity surveying and site engineering roles, I consider how something will be practically constructed during the estimating process. This can be seen in the quantity values.
Supervised community projects including new primary schools, community clinics, gravel roads and water supply systems. Work carried out from planning to handover. Also covered quantity surveying, Bills of Quantities and tender documentation.
A Bar Bending Schedule needs enough reinforcement detail on the structural drawings. When it's there, I list the bar marks, diameters, shapes, cutting lengths and total steel. I send it in Excel, so you can check it, plan fabrication or ask suppliers for prices.
If your IFC model is detailed enough, I take the volumes, areas and element counts out of it and put them in a CSV or Excel schedule. You review it from there.
Quantity schedules for one trade at a time, such as drywall partitions, certain MEP elements or reinforcement, so you can tender or price a subcontract.
Repair estimates broken down item by item, from whatever you can give me: site photos, damage reports, drawings or models. The more detail you send, the more complete the estimate gets.
| Building Category / Scale | Full Bill of Quantities (BoQ) & Takeoff | Structural Takeoff OnlyConcrete & Rebar | Architectural Finishing Takeoff OnlyFinishing Works |
|---|---|---|---|
| G+2 to G+4Low-Rise Residential / Villa / Commercial | $350 – $650 | $200 – $350 | $150 – $250 |
| G+5 to G+8Mid-Rise Apartment / Office Building | $700 – $1,200 | $400 – $650 | $300 – $500 |
| G+9 to G+12High-Rise Commercial / Residential | $1,300 – $2,200 | $750 – $1,200 | $500 – $850 |
| G+13 to G+20Major High-Rise / Mixed-Use Towers | $2,300 – $4,500+ | $1,300 – $2,400 | $900 – $1,800 |
| Project Size | Framing / Lumber Only | Full House BOQFull House Takeoff |
|---|---|---|
| Small HomeUnder 1,500 ft² (140 m²) | $120 – $220avg. $170 | $250 – $450avg. $350 |
| Medium / Custom Home1,500 – 3,500 ft² (140 – 325 m²) | $220 – $400avg. $310 | $450 – $850avg. $650 |
| Large Home / Townhouse (Multi-Family)Over 3,500 ft² (325 m²) | $400 – $750+avg. $575 | $850 – $1,600+avg. $1,225 |
All prices are in US dollars, shown as a range with a typical average. Floor area, how complicated the plans are and the number of sheets all move the final quote. There's a CSI-2 Wood Frame sample under Takeoff Samples if you want to see one.
| Service & Work Description | Small Scope | Medium Scope | Large / Complex |
|---|---|---|---|
| 5D BIM Quantity Takeoffs.IFC to CSV/Excel: volumes, areas and item counts taken from your .IFC files | $150 – $300Average: $225 | $350 – $750Average: $550 | $800 – $2,000+Average: $1,400 |
| Subcontractor Trade TakeoffsDrywall, MEP, rebar: material lists for one trade, ready for your bid | $100 – $250Average: $175 | $250 – $550Average: $400 | $600 – $1,400+Average: $1,000 |
| Insurance Repair BOQsClaim and damage estimates: itemized repair costs from photos, reports or models | $120 – $250Average: $185 | $250 – $600Average: $425 | $650 – $1,500+Average: $1,075 |
| Typical Work / Complexity | Estimated Price | What’s Included |
|---|---|---|
| Small ScopeSingle elements (footings, columns, beams, walls) or small residential packages | $75 – $180 | Bar marks, cut lengths, bend shapes, and total weight in Excel |
| Medium ScopeMulti-story slabs, framing zones, or mid-size commercial / residential sets | $250 – $650+ | Member-by-member schedules, lap / hook allowances, and a procurement summary |
| Large / ComplexFull building packages, complex or heavy layouts, or ongoing revisions | $800 – $2,000+ | Full BBS package, drawing revision updates, and priority turnaround |
Small scope is one type of structural element, or one small section. Think only footings, only columns, only beams, or a small residential item. It's not a whole building. Medium scope is several elements together, like footings, columns and beams or slabs for one section, or a mid-size residential or commercial project.
I want you to feel sure about the accuracy and quality of my work before you commit to anything. So when you place your first order with me, I'll do it for half the price shown in the pricing tables above. The offer applies to projects priced at $600 or more in the tables. If you have a different arrangement in mind, I'm open to discussing it. Either way, The offer applies to projects with a total standard price of $600 or more, and I'm open to negotiating if you have a different proposal. I'll confirm the terms in writing before I start.
Email your architectural and structural drawings as PDFs, or an IFC model if you have a suitable one, to belayamba1984@gmail.com. Files too big for email? Upload them to Google Drive or Dropbox, click Share, set access to "Anyone with the link", then copy the link and email it to me. If the link isn't set to "Anyone with the link", I won't be able to open it. Tell me where the project is, what the scope is and any specifications I should know about.
I go through what you sent and look at the scope, how many sheets there are and how complicated the job is. Then I email you a price and a delivery time I can stick to. If anything's unclear, I'll ask you before I quote.
When we agree on the price and delivery time, I email you the service agreement. You read it and we both sign electronically. I start as soon as the signed copy is back with me.
You get the deliverables we agreed on, in the formats written in the quotation. That's normally Excel and/or PDF. If revision rounds are included, the scope will say so.
Before we start: please send your company profile and a LinkedIn page for your business along with your drawings. I work with clients in other countries, so this is simply how I confirm I'm dealing with a real, registered contractor.
Payment stages:
30% Upfront: paid when we sign the service agreement, so I can start your project.
30% Progress payment: due when we reach the milestone we agreed on.
40% Final payment: due when the work is complete.
Every price here is an estimated range in US dollars. The final quote depends on drawing size, the number of sheets and how complex they are. Wood-frame houses and rebar (BBS) have their own tables above.
These samples show how I organise quantities into BOQ and takeoff schedules. Read each one together with the drawing scope and assumptions written next to it.




Here's the same G+3 residential project in several measurement and classification formats, plus one separate US wood-frame house (CSI-2). The quantities are the same, only the layout changes. On a real project, we'd agree on the format first.
Got a BOQ template or measurement standard you prefer? Send it with the project documents and we'll settle the output format before I start measuring.
Scope of these samples: I measured general requirements (Div. 01), concrete, masonry, metals, waterproofing, openings and finishes (Div. 03–05, 07–09), plus earthwork and external works (Div. 31–33), straight from the drawings. Furnishings, plumbing and electrical are provisional items. Lifts, HVAC, fire protection, communications and security are out unless you send drawings for them. Wood framing (Div. 06) is in the separate CSI-2 wood-frame sample. Send me your drawings and I'll stretch the scope to fit your specification.


| Item No | Description of Works | Unit | Quantity | Deductions / Notes |
|---|---|---|---|---|
| 1.1 | C-25 Structural Concrete for Foundation Footings | m³ | 45.80 | Net volume excluding rebar displacement |
| 1.2 | 20cm Thick Solid Concrete Block (HCB) Masonry | m² | 185.20 | Door and window structural openings deducted |
| 1.3 | Sieved Sand Plaster (Fino Finish) to Interior Walls | m² | 370.40 | Applied 2 coats over smooth backing plaster |
| 1.4 | Exterior Weather-Resistant Facade Paint Work | m² | 4,437.00 | Calculated from exterior scaffolding drops |
Email: belayamba1984@gmail.com
Location: Addis Ababa, Ethiopia
This gallery has some of my takeoff layouts, Bar Bending Schedules (BBS), PlanSwift workflows and BIM-related quantity outputs. They show how I present results and how I work. What you actually get will depend on the drawings and model information you send.